Pvc floor pavement construction process - sticky tape

    Pvc floor pavement construction process - sticky tape

   Process one: pre-shop. Requirements: solid ground, no sand, no powder, clean and dry, within 2m height difference within 2mm or leveled polished, clean self-leveling; Material: pvc floor (with volume number); Method: align by volume number layout.

    Process II: bonding. Requirements: Pre-paved floor; Tools: Marker; Material: Adhesive Tape; Method: 1. Dashing - Use a marker to mark along the seam. 2. Adhesive Tape --- Align the black tape with the middle of the adhesive tape and remove the wax paper. 3. Fix the floor - Fix one side of the floor first, and press the other side tightly to the fixed side.

    Process III: trimming. Requirement: The whole piece of rubber is laid; Tool: steel ruler, hook knife or wallpaper knife; Method: After the steel part of the corners is pressed, use a hook knife or a wallpaper knife to cut; clean the scene.

    Process four: slot welding. Requirement: Laying finishing; Tool: Steel ruler, slotter, torch, moon blade or trowel; Material: Weld wire; Method: 1. Grooving—align the steel rule along the floor seam, use slotting The knife is grooved and the depth of the groove is controlled at one-third of the total thickness of the floor. 2. Welding—The welding torch is welded along the slotted position. After completion, the raised wire is flattened with a crescent blade.


Contacts: 

Sam   Woo    +86 13758290649

Michael  Lee  +86 13867165731

Tel:+86 579 8911 9668

Fax:+86 579 8237 2753

Email:   sam@tkfloor.com      michael@tkfloor.com

Website:www.tkfloor.net